LOAD BANK RENTAL (Typical for 1000 KW or 1 MW)
CAPACITY OF EACH BANK 210 / 225 Amps at Unity Power Factor
DUTY: Continuous
No. of banks for 1000 KW (1 MW): 7 No’s
RESOLUTION - Load Step: 210 / 225 Amps (150 to 165 KW) & 30 KW
Bill of material
- 3.5 C x 240 sq mm, Al armored cable – 7 cables of length 23 to 27 meters each, with lugs crimped on both ends
- Resistive Load Bank with Enclosure – 210 / 225 Amps capacity each
- 250 Amps SFU – 7 Nos, One for each load bank
- Clip ON Meter
- Multi meter
- Air Dryer / Exhaust Fans
- Armored cable shall be laid on surface from Main LT panel / DG panel & connected to SFU of Load Bank
- Load bank shall be kept out in the open. If raining, testing is stopped.
- 250 Amps SFU – 7 Nos, One for each load bank
- Each Load Bank size with Enclosure – 2400 L x 600 W x 1350 H mm
- Minimum 1500 mm distance to be kept between each bank.
- Total ground area required – 120 to 150 Sq meters (4 to 5 Mts X 30 to 35 Mts approximately)
- All Cables are provided with suitable aluminum crimped lugs on both ends.
- Earthing to the load banks are connected through cable armor
- Suitable arrangements to connect the cables to the DG breaker / MCCB / SFU are to be carried out by the customer.
- Total time required to assemble and position the banks & cable connections - 2 to 3 Hrs
- Data centers (heat load) for air conditioners