LOAD BANK RENTAL (Typical for 1000 KW or 1 MW)
     

CAPACITY OF EACH BANK

 
210 / 225 Amps at Unity Power Factor
DUTY:  
Continuous
No. of banks for 1000 KW (1 MW):  
7 No’s
RESOLUTION - Load Step:  
210 / 225 Amps (150 to 165 KW) & 30 KW
 
Bill of material
 
bill
 
 
3.5 C x 240 sq mm, Al armored cable – 7 cables of length 23 to 27 meters each, with lugs crimped on both ends
 
Resistive Load Bank with Enclosure – 210 / 225 Amps capacity each
 
250 Amps SFU – 7 Nos, One for each load bank
 
Clip ON Meter
 
Multi meter
 
Air Dryer / Exhaust Fans
 
bill
 
 
Armored cable shall be laid on surface from Main LT panel / DG panel & connected to SFU of Load Bank
 
Load bank shall be kept out in the open. If raining, testing is stopped.
 
250 Amps SFU – 7 Nos, One for each load bank
 
Each Load Bank size with Enclosure – 2400 L x 600 W x 1350 H mm
 
Minimum 1500 mm distance to be kept between each bank.
 
Total ground area required – 120 to 150 Sq meters (4 to 5 Mts X 30 to 35 Mts approximately)
 
bill
 
 
All Cables are provided with suitable aluminum crimped lugs on both ends.
 
Earthing to the load banks are connected through cable armor
 
Suitable arrangements to connect the cables to the DG breaker / MCCB / SFU are to be carried out by the customer.
 
Total time required to assemble and position the banks & cable connections - 2 to 3 Hrs
 
Data centers (heat load) for air conditioners
 